A recently built 1,200-ton railway drydock at Zeebrugge, Belgium, with two 1,000-ton side transfer berths, has proven very effective and economical, with no land space wasted for a cross transfer. The very shore duration of vessel repairs, ranging from eight hours to about three days, is done mainly on the cradle of the drydock.