VR
Home    /   Case

What are all the safety procedures for railed transfer cars?

2021-11-25

Rail transfer car manufacturers said that because the use of the rail electric transfer car environment is generally harsh, so the requirements of the motor, the battery is more durable, can adapt to dust, high temperature, rugged roads and other environments, the frame material, welding process requirements, such as higher, frame with pipe thickness are more than 2.5, welding using plasma shielded welding, high welding density, weld tensile strength, not easy to fracture. Can adapt to the requirements of the factory operating environment.

railed transfer cars 25 ton.jpg

The rail electric transfer vehicle is a transportation tool for pulling goods or people with the electric battery as the power and electric motor as the drive; electricity as a kind of environmental protection, clean, the high conversion rate of important energy, the application of electric power to drive the replacement of transportation, promote the low-carbon development of the transportation industry, reduce transportation costs, save energy, protect the environment, is one of the important topics of research in the world, after decades of development, it has been applied in many fields such as urban bus vehicles, electric transportation vehicles in factories and mines, electric urban sanitation and cleaning vehicles, engineering, construction of subways, etc.

How to safely operate the rail transfer car? The rail transfer car must have a person to operate and maintain, non-operators are not allowed to use it. Before working, the operator must check whether there are obstacles on the track, electrical wiring and control switches are safe and reliable.

railed transfer cars 35 ton.jpg

The railed transfer car must sound the bell before starting smoothly and be aware of any abnormalities around it and be ready to stop at any time. Do not collide with the rail end stopper. During operation, it should travel slowly and is not allowed to change the direction of travel at a fast speed. During operation, maintenance and cleaning work is prohibited. When loading objects, overloading is not allowed and the objects should be evenly distributed. In case of sudden power failure during work, the control switch should be restored to zero position. After the work is finished, the power must be cut off. Remove the load and clean up the equipment. In case of a sudden power failure during work, the control switch should be restored to zero position. After work is completed, the power must be cut off. Remove the load and clean the equipment. After a major repair, the rail electric transfer car must be accepted by the using unit and meet the safety requirements before it is allowed to be used.